index

Waterproof Dog Training Leash 50Ft 30Ft 15Ft 10Ft 5Ft Heavy Duty Recall Long Lead For Large Medium Small Dogs (50Ft, Orange)

  • $31.74
  • Regular price $45.34
  • 5 available

Shipping calculated at checkout


Hurrify, 5 item(s) left in stock!

Join Waitlist
Wishlist

Vendor: Nimble

Type: Training & Behavior

Sku: WBPETB0CDWPLWYM

Available: Available

Sold by Petocart, an authorized reseller.

Returns accepted within 30 days  |  support@petocartv.com

✓ Verified
Shipping Information
  • Shipping calculated at checkout
  • Processing Time: 3-5 business days
  • Estimated Delivery: 6-10 business days
  • Safely packaged to keep your pet's products fresh & intact
  • Tracking number sent via email once dispatched
  • Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Restocking fee may apply

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@petocartv.com +1 281-738-1130
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🐾

Pet Safety Advisory

Consult your veterinarian before use if your pet has a known medical condition, is pregnant, nursing, or is on medication.

Keep out of reach of children. For animal use only.

ℹ️

Product Usage Notice

Always read labels, directions, and ingredient lists before use. Discontinue use and contact your vet if your pet shows signs of adverse reaction.

Guarantee safe checkout

Waterproof Dog Training Leash 50Ft 30Ft 15Ft 10Ft 5Ft Heavy Duty Recall Long Lead For Large Medium Small Dogs (50Ft, Orange)

$31.74

Frequently Asked Questions

  • Q: What sizes does this dog training leash come in? A: This dog training leash comes in five lengths: five feet, ten feet, fifteen feet, thirty feet, and fifty feet.
  • Q: What material is the leash made of? A: The leash is made from PVC coated nylon webbing, ensuring durability and weather resistance.
  • Q: What is the width of the leash? A: The leash has a width of three-fifths of an inch, providing a comfortable grip for handling.
  • Q: How much weight can this leash support? A: This leash can withstand a pull force of up to six hundred pounds, making it suitable for large and strong dogs.
  • Q: Is this leash suitable for training my dog? A: Yes, this leash is specifically designed for dog training, enhancing recall skills and obedience.
  • Q: Can I use this leash for outdoor activities? A: Yes, it is ideal for outdoor activities such as hiking, camping, and beach play due to its weatherproof design.
  • Q: How do I clean this dog training leash? A: You can easily clean the leash with mild soap and water, as it is designed to be easy to clean and odor-resistant.
  • Q: Is the leash safe for my pet in wet conditions? A: Yes, the leash is weatherproof and remains strong even when wet, ensuring safety during rainy walks.
  • Q: How should I store the leash when not in use? A: Store the leash in a cool, dry place away from direct sunlight to maintain its durability and prevent wear.
  • Q: What colors are available for this leash? A: This leash is available in multiple colors, including a bright orange option for visibility during outdoor activities.
  • Q: Can I use this leash for small dogs? A: Yes, this leash is suitable for small, medium, and large dogs, making it versatile for various breeds.
  • Q: Is this leash comfortable for long walks? A: Yes, the leash is designed to be strong yet soft, providing comfort for both the handler and the dog.
  • Q: Does the leash come with a warranty? A: Please check with the manufacturer for warranty details, as product warranties may vary.
  • Q: What if the leash arrives damaged? A: If the leash arrives damaged, you should contact customer support for assistance with returns or exchanges.
  • Q: Is this leash suitable for beginners? A: Yes, this leash is user-friendly and suitable for both beginners and experienced dog owners.
  • Q: How do I adjust the length of the leash? A: The leash length is fixed and comes in specific sizes; choose the length that best suits your needs.

Recently viewed