index

Waterproof Dog Training Leash 50Ft 30Ft 15Ft 10Ft 5Ft Heavy Duty Recall Long Lead For Large Medium Small Dogs (50Ft, Mint Green)

  • $31.74
  • Regular price $45.34
  • 5 available

Shipping calculated at checkout


Hurrify, 5 item(s) left in stock!

Join Waitlist
Wishlist

Vendor: Nimble

Type: Training & Behavior

Sku: WBPETB0B24WSFBP

Available: Available

Sold by Petocart, an authorized reseller.

Returns accepted within 30 days  |  support@petocartv.com

✓ Verified
Shipping Information
  • Shipping calculated at checkout
  • Processing Time: 3-5 business days
  • Estimated Delivery: 6-10 business days
  • Safely packaged to keep your pet's products fresh & intact
  • Tracking number sent via email once dispatched
  • Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Restocking fee may apply

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@petocartv.com +1 281-738-1130
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🐾

Pet Safety Advisory

Consult your veterinarian before use if your pet has a known medical condition, is pregnant, nursing, or is on medication.

Keep out of reach of children. For animal use only.

ℹ️

Product Usage Notice

Always read labels, directions, and ingredient lists before use. Discontinue use and contact your vet if your pet shows signs of adverse reaction.

Guarantee safe checkout

Waterproof Dog Training Leash 50Ft 30Ft 15Ft 10Ft 5Ft Heavy Duty Recall Long Lead For Large Medium Small Dogs (50Ft, Mint Green)

$31.74

Frequently Asked Questions

  • Q: What material is the Waterproof Dog Training Leash made of? A: The leash is made from one hundred percent environmentally friendly PVC material. This material is lightweight, waterproof, and weatherproof, making it easy to clean.
  • Q: What are the available sizes of the leash? A: The leash is available in five sizes: five feet, ten feet, fifteen feet, thirty feet, and fifty feet. This range allows you to choose the perfect length for your dog's training needs.
  • Q: What colors can I choose for the leash? A: The leash comes in multiple colors, including pink, blue, orange, black, and mint green. You can select a color that best suits your pet.
  • Q: How do I use the Waterproof Dog Training Leash for training? A: You can use the leash for recall training by allowing your dog to roam while still being securely attached. It is ideal for outdoor activities like hiking, camping, and swimming.
  • Q: Is this leash suitable for small dogs? A: Yes, the leash is suitable for small dogs as well as large and medium breeds. Its heavy-duty design ensures it can handle up to six hundred pounds of pull force.
  • Q: Can I use this leash in all weather conditions? A: Yes, the leash is designed to withstand all weather conditions. Its waterproof material ensures durability in rain or snow.
  • Q: How do I clean the Waterproof Dog Training Leash? A: You can easily clean the leash by wiping it down with a damp cloth. The PVC material does not absorb water and is resistant to dirt.
  • Q: What is the warranty policy for the leash? A: The product comes with a one hundred percent money-back guarantee. If you're not satisfied, you can return it for a full refund or exchange.
  • Q: How do I store the leash when not in use? A: You can store the leash in a cool, dry place. It's best to hang it or keep it in a pet accessory bag to prevent tangling.
  • Q: Is this leash safe for my pet? A: Yes, the leash is designed to be safe and comfortable for pets. It is made from a soft, flexible material that is smell-free.
  • Q: What makes this leash heavy duty? A: The leash's heavy-duty design features strong tensile resistance, capable of handling six hundred pounds of pull force. This ensures it won't easily rip or tear.
  • Q: Can I use this leash for swimming? A: Yes, the waterproof design makes it perfect for swimming. It allows your dog to enjoy water activities without damaging the leash.
  • Q: What if the leash arrives damaged? A: If the leash arrives damaged, you can contact customer service for a replacement. They will assist you with the return process.
  • Q: Is this leash suitable for training in the backyard? A: Yes, the leash is ideal for training in the backyard. It provides your dog with freedom while ensuring control during training sessions.
  • Q: Does the leash have any odor? A: No, the leash is made from a smell-free material. It does not retain odors, making it pleasant to use.
  • Q: Does this leash come with any additional features? A: Yes, the leash features multiple length options and color choices, allowing for customization according to your preferences and your dog's needs.

Recently viewed