index

Luffwell Runner For Yard, 100Ft Long Lead With 10Ft Pulley Tie Out Cable For Heavy Duty Dogs Up To 250Lbs, Trolley System For La

  • Regular price $47.96
  • Will be in stock after

Shipping calculated at checkout


Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Vendor: Luffwell

Type: Training & Behavior

Sku: WBPETB0DPJQ3G14

Available: Sold Out

Sold by Petocart, an authorized reseller.

Returns accepted within 30 days  |  support@petocartv.com

✓ Verified
Shipping Information
  • Shipping calculated at checkout
  • Processing Time: 3-5 business days
  • Estimated Delivery: 6-10 business days
  • Safely packaged to keep your pet's products fresh & intact
  • Tracking number sent via email once dispatched
  • Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Restocking fee may apply

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@petocartv.com +1 281-738-1130
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🐾

Pet Safety Advisory

Consult your veterinarian before use if your pet has a known medical condition, is pregnant, nursing, or is on medication.

Keep out of reach of children. For animal use only.

ℹ️

Product Usage Notice

Always read labels, directions, and ingredient lists before use. Discontinue use and contact your vet if your pet shows signs of adverse reaction.

Guarantee safe checkout

Luffwell Runner For Yard, 100Ft Long Lead With 10Ft Pulley Tie Out Cable For Heavy Duty Dogs Up To 250Lbs, Trolley System For La

$47.96

Frequently Asked Questions

  • Q: What is the length of the LUFFWELL Runner for Yard? A: The LUFFWELL Runner is one hundred feet long, with an additional ten-foot pulley tie-out cable.
  • Q: What weight limit does the dog trolley system support? A: This trolley system can support dogs weighing up to two hundred fifty pounds.
  • Q: What materials are used in the dog tie-out cable? A: The dog tie-out cable is made from galvanized steel, with a crack-resistant poly vinyl coating for durability.
  • Q: How do I install the LUFFWELL Dog Trolley System? A: The system comes with all necessary components and detailed installation instructions for easy setup.
  • Q: Is the LUFFWELL Runner suitable for large dogs? A: Yes, it is specifically designed for large dogs weighing up to two hundred fifty pounds.
  • Q: How do I use the dog runner system? A: Simply anchor the tie-out cable to a fixed point and attach the collar clip to your dog's harness for secure roaming.
  • Q: What are the care instructions for the dog tie-out cable? A: To maintain the cable, clean it with a damp cloth and store it in the included oxford carry bag when not in use.
  • Q: How can I ensure my dog stays safe while using the runner system? A: The shock-absorbing spring feature reduces tension and prevents injury, keeping your dog safe while they explore.
  • Q: What happens if the LUFFWELL Runner arrives damaged? A: If the product arrives damaged, please contact customer support for assistance with a return or replacement.
  • Q: How does the tangle-free collar clip work? A: The tangle-free collar clip allows for a full three hundred sixty-degree swivel, preventing tangles as your dog roams.
  • Q: Is the LUFFWELL Runner waterproof? A: Yes, the galvanized steel leash is coated to be weatherproof and resistant to rust, ensuring longevity in various conditions.
  • Q: Can I use the dog runner system in a park or beach? A: Yes, the LUFFWELL Dog Trolley System is ideal for outdoor activities such as parks, beaches, and camping.
  • Q: What should I do if the dog cable gets tangled? A: The system is designed to minimize tangling, but if it does, gently untwist the cable and ensure the clip is free to move.
  • Q: Does the product come with a warranty? A: Yes, the LUFFWELL Runner typically includes a warranty; please check with the retailer for specific details.
  • Q: How portable is the LUFFWELL Dog Trolley System? A: The system is highly portable, as it comes with a sturdy oxford carry bag for easy storage and transport.

Recently viewed